• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
    1. Infocenter
    2. News
    26 November 2025

    The IAEA Comprehensive Safety Assessment Mission to Chornobyl NPP has started its work

    • Print
    • Email

    This mission is being conducted at the request of Ukraine and was prompted by the attack carried out by a Russian strike UAV equipped with a high-explosive charge. The attack damaged the outer and inner claddings of the New Safe Confinement arch, as well as a number of internal structures, components, and systems important for the safety and functions of the NSC, which were designed to support the transformation of the Shelter Object into an environmentally safe system.

    The objective of the mission is to perform an independent assessment of the current safety condition of the facility.

    Read more ...

    20 November 2025

    SSM delegation visits Chornobyl NPP

    • Print
    • Email

    On 20 November, a delegation from the Swedish Radiation Safety Authority (SSM), headed by Director General Mr. Michael Knochenhauer, visited the Chornobyl Nuclear Power Plant.

    During the visit, Swedish radiation safety experts received detailed information about the current status of the Chornobyl NPP and the key tasks being carried out by the plant’s personnel.

    Read more ...

    18 November 2025

    Five Years of Safe Storage of Spent Nuclear Fuel at Chornobyl NPP: A Quarter of All Chornobyl NPP Spent Fuel Has Already Been Transferred to the New Facility

    • Print
    • Email

    18 November 2025 marks the fifth anniversary of the loading of the first batch of spent nuclear fuel (SNF) into the Spent Fuel Dry Storage Facility (ISF-2) at the Chornobyl Nuclear Power Plant. On this day in 2020, the first canister was placed into storage during hot trials, and full-scale industrial operation of the facility began in July 2021 after the operating license was obtained.

    Over the past five years, a quarter of all spent nuclear fuel from Chornobyl NPP has already been transferred from the old “wet” storage (ISF-1) to ISF-2. This has significantly reduced risks and clearly demonstrates substantial progress in the decommissioning process.

    Read more ...

    10 November 2025

    Chornobyl NPP Representatives Returned from International Workshop Held in France

    • Print
    • Email

    At the end of October, Chornobyl NPP specialists participated in an international workshop on Safe Enclosure of Graphite Power Reactors held in Lyon, France. The event was organized by the International Atomic Energy Agency (IAEA) together with the Electricité de France (EDF), namely with its Deconstruction and Waste Projects Department (DP2D).

    Read more ...

    05 November 2025

    Chornobyl NPP, EBRD and French companies work together to restore the functionality of the Confinement

    • Print
    • Email

    The European Bank for Reconstruction and Development (EBRD), and the French companies Bouygues and Vinci, part of the original Novarka consortium, are working on engineering solutions to restore the functionality of the New Safe Confinement (NSC). The progress was discussed during the meeting between Chornobyl NPP Director General Serhii Tarakanov and the project managers from the EBRD, Bouygues and Vinci in Paris.

    Read more ...

    1. Chornobyl NPP to Cooperate with French Framatome
    2. The European Investment Bank and the Chornobyl Nuclear Power Plant have determined directions of the future cooperation.
    3. Specialists from the Chornobyl NPP mastered modern costs estimation tools for decommissioning during workshop in Bratislava
    4. Greenpeace visited the Chornobyl Nuclear Power Plant

    Page 9 of 129

    • Start
    • «
    • 4
    • 5
    • 6
    • 7
    • 8
    • 9
    • 10
    • 11
    • 12
    • 13
    • »
    • End
    Copyright © 2026 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Культура захищеності