• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    1. Infocenter
    2. News
    25 April 2019

    NSC in the trial operation mode

    • Print
    • Email

    On April 22 the New Safe Confinement was transferred to trial operation mode. During the trial operation practically all NSC equipment and systems will be operated in the design mode within 72 hours. The goal of the trial operation is to make sure that all equipment and devices are operated in the design mode and perform their functions. In addition, such operation will allow checking the level of ChNPP's personnel qualification gained during the training.

    The test subject during the trial operation is the conditional dismantling of SO unstable structures.

    The first stage of the trial operation was devoted to the testing of the main cranes system (hereinafter: MCS): movement of carriages from bridge cranes to maintenance garages (northern and southern garages).

    During the second testing day the MCS crane run-way beams were inspected and movement of two cranes (western and eastern) over the Shelter Object roof was tested. After that dismantling, lifting and movement to the temporary storage site of a metal truss, established during the Shelter Object stabilization measures, was simulated.

    Read more ...

    22 April 2019

    Members of the Central Executive Authorities Visit ChNPP

    • Print
    • Email

    Today, on the 19th of April 2019, representatives of ministries, central executive authorities and the Secretariat of the Cabinet of Ministers of Ukraine have made a working visit to the industrial site of ChNPP. The aim of the working visit is to familiarize with the progress of regional development projects implemented in Kyiv Region through the funds of the State Regional Development Fund, as well as with the status of the Chornobyl Exclusion Zone and its current activities.

    During the visit, the delegation members visited the construction site of the Interim Spent Fuel Storage Facility of dry type (ISF-2) designed for acceptance, processing and storage of spent fuel assemblies accumulated during ChNPP operation for a period of 100 years.

    The visitors got familiar with the progress of activities connected to ISF-2 preparation for “hot tests”, and had a look at the railcar acceptance room and the Spent Fuel Processing Facility.

    Read more ...

    16 April 2019

    WANO Member Support Mission starts at Chornobyl NPP

    • Print
    • Email

    During the week from 15 to 19 April 2019, ChNPP technical specialists together with WANO experts will review international best practices in the long-term dry storage of spent nuclear fuel (SNF) and identify possible risks as well as ways to manage them regarding ChNPP site.

    Day 1 of the mission was dedicated to presenting ChNPP’s approach to SNF storage process. In particular, during the presentation it was mentioned that currently SNF is being stored at a wet-type interim storage facility at ChNPP industrial site, while the Interim Spent Fuel Storage Facility of dry type (ISF-2) is currently under construction, financed through the Nuclear Safety Account of European Bank for Reconstruction and Development.

    Experts of the support mission are representatives of Ignalina NPP (Lithuania), Paks NPP (Hungaria), Doel NPP (Belgium), and Ontario Power Generation (Canada); all of them have got long-term practical experience in dry storage of spent nuclear fuel.

    As a result of this mission it is expected to receive information which will help to minimize faults connected to long-term dry storage of SNF and gain practical experience in this activity by ChNPP personnel.

    Read more ...

    03 April 2019

    Mural will be created at ChNPP

    • Print
    • Email

    A Contest for the best sketch design for creation of a mural at the Chornobyl NPP commences on April 3.

    A painting will be located at the Eastern wall of the Turbine Hall facing the office rooms of the ChNPP. Thus, each day about thousand persons from the Plant’s staff and visitors will see this mural.

    The Contest’s task is to develop the mural’s design including a colour sketch, name of the design, concept and brief description. The design must be tailored to 18.5 m х 57.9 m dimensions.

    Number of works from one participant is not limited. A winner of the Contest is awarded with an exclusive 2-day individual excursion to the Chornobyl NPP and Prypiat, and money reward as well.

    Read more ...

    20 March 2019

    A New Director at ChNPP

    • Print
    • Email

    The Acting Director General of Chornobyl NPP was changed on 19th March. Serhii Kalashnyk took up this position. Previously he worked as a Deputy Manager of the New Safe Confinement Project at the Joint Venture NOVARKA (VINCI CGP/ BOUYGUES).

    “I believe that the first priority and the most important thing in my life is people. Human life is the most valuable thing in possession of our civilization. The first thing that preserves out lives is occupational health and safety in all of its aspects. People must be provided with protection equipment, must be trained and supervised” – emphasized Mr. Kalashnyk in his speech.

    Also Mr. Kalashnyk announced that in his work he will focus on the quality of workplaces and production means. Besides, among the priorities are training of personnel of all levels in terms of mastering new processes and equipment on the ChNPP site, as well as the salary increase in light of the professional development of staff, complexity and intensity of work.

    The order for appointment of the new Acting Director General was signed by the Head of the State Agency of Ukraine on the Exclusion Zone Management Vitalii Petruk on the ground of the SAUEZM’s Charter approved by the Resolution of the Cabinet of Ministers of Ukraine No.564, and taking into account the requirements of Article 9 of the Law of Ukraine “On permitting activity in the field of nuclear energy utilization”.

    Read more ...

    1. New Project with Vodafone?
    2. Testing of NSC Main Cranes System
    3. IAEA Expert Assistance in Management of RAW
    4. Everybody to the exit: fire training at ChNPP

    Page 52 of 117

    • Start
    • «
    • 47
    • 48
    • 49
    • 50
    • 51
    • 52
    • 53
    • 54
    • 55
    • 56
    • »
    • End
    Copyright © 2025 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності