• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    1. Infocenter
    2. News
    26 December 2018

    “Chornobyl is the territory of change” even in small ways

    • Print
    • Email

    Chornobyl NPP goes on implementing the task declared by the State Exclusion Zone Management Agency of Ukraine on transferring the 30-kilometer area into the Territory of change.

    ChNPP staff has made a decision that there is no need to put the freshly felled Christmas tree in front of the ChNPP Administrative building. Instead, in order to create Christmas and New Year mood everyone can decorate one of the trees planted near the Monument to the Heroes of Chornobyl, starting from this year.

    - Caring about the environment and nature comes out in preserving every tree in the Exclusion zone. Moreover, we used to put 5-6 meter tall trees in front of the Administrative building, while a standard one and a half meter fir tree usually grows for more than 10 years, — Oleksandr Novikov, Deputy Technical Director for Safety, commented on the holiday campaign.

    Read more ...

    19 December 2018

    Chornobyl NPP takes part in an exhibition being conducted in the Verkhovna Rada of Ukraine

    • Print
    • Email

    Exhibition “Chornobyl: The Territory of Change”, which is devoted to the Liquidator’s Day, was opened in the Verkhovna Rada of Ukraine on December 18.

    The exhibition comprises a thematic photo-exposition, collected from the best works of image banks of ChNPP, SAUEZM and other enterprises, as well as interactive multimedia part using the state-of-the-art technologies to illustrate processes that run at the Chornobyl NPP and within the Exclusion Zone.

    During four days visitors of a house of the Parliament of Ukraine will be able to ask questions to ChNPP and SAUEZM specialists, to be briefed on the current situation within the ChNPP industrial site and Exclusion Zone, and to receive information about implementation of international projects, decommissioning of the ChNPP Units, transformation of the Shelter Object into environmentally safe system, and other activities.

    Read more ...

    14 December 2018

    December 14 — Day in honoring of the Chornobyl accident consequences liquidation participants

    • Print
    • Email

    December 14, Ukraine honors the Chornobyl accident consequences liquidators.
     
    The date to honor the liquidators is chosen not without reason. On November 30, 1986, the sarcophagus construction over the Unit 4 was completed, and two weeks later, on December 14, the main CPSU newspaper “Pravda" and other central publications of USSR published the Statement of the Central Committee of CPSU and the Council of Ministers that the State Commission had been commissioned the complex of protective structures of ChNPP Unit 4. Namely the date of this statement publication became “Day of Chornobyl accident consequences liquidation participants honoring”.
     
    Despite the fact that the Liquidators Day was officially established only in 2006, it is commemorated in Ukraine since 1986, when the NPP’s accident consequences liquidators gathered together to celebrate their first victory.

    Read more ...

    14 December 2018

    IAEA Mission: decommissioning of the facilities and Radioactive Materials Management

    • Print
    • Email

    IAEA mission was held at Chornobyl Nuclear Power Plant, which addressed the issues of buildings and structures decommissioning, decommissioning methods, as well as processing of radioactively contaminated concrete and waste generated, including radioactive ones.

    Although the final state of Chornobyl NPP site does not include a large-scale dismantling of existing buildings and structures, a considerable amount of reinforced concrete waste will be formed during the Central Halls hipped roof reconstruction and the equipment dismantling. Another source of its generation will be Shelter object unstable structures dismantling. All this right now requires consideration of such waste decontamination and processing in order to minimize its volume. Existing at Chornobyl NPP decontamination system today is not intended for large-scale decontamination, does not allow to decontaminate firmly fixed contamination and leads to formation of a large volume of secondary waste.

    Read more ...

    13 December 2018

    Assemblies of Chornobyl Shelter Fund and Nuclear Safety Account contributors

    • Print
    • Email

    Assemblies Chornobyl Shelter Fund and the Nuclear Safety Account contributors was held in London.

    Ukraine was represented by the Head of the Committee on Environmental Policy, Natural Resource Management and Chornobyl Accident Consequences Elimination - Andrei Dyriv, Minister of Ecology and Natural Resources of Ukraine Ostap Semerak, Head of the subcommittee Ivan Rybak, head of SAMEZ Vitaly Petruk, head of the State Nuclear Regulation Inspectorate Grigory Plachkov, SSE ChNPP Acting General Director Valeriy Seyda. Vladimir Kashtanov, the Chief Engineer of the Shelter Implementation Plan Project and Andrii Savin, the Chief Engineer of the Safety Improvement Project participated as technical experts.
     
    Representatives of the Ukrainian delegation in their presentation expressed their gratitude to international partners for their efforts in implementing projects to improve safety at the Chornobyl NPP industrial site and informed the meeting participants about the fulfillment of obligations undertaken by Ukraine. It was specially noted that funds for operation of NSC and ISF-2 facilities are provided in the State Budget of Ukraine starting from 2019.

    Read more ...

    1. ChNPP continues sharing experience with TEPCO’s specialists
    2. International Conference on Shelter Transformation
    3. The cooperation of Chornobyl NPP with Belgian Tecnubel company representatives will continue
    4. Drill at ChNPP: simulated earthquake and its aftermath

    Page 55 of 117

    • Start
    • «
    • 50
    • 51
    • 52
    • 53
    • 54
    • 55
    • 56
    • 57
    • 58
    • 59
    • »
    • End
    Copyright © 2025 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності