• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    1. Infocenter
    2. News
    04 May 2022

    Dust-suppression works resumed at Chornobyl NPP after occupation

    • Print
    • Email

    During 1-2 May 2022, personnel of the NSC (Objects Shelter) Operation Shop successfully carried out dust-suppression works (feeding of localizing dust-suppressing solution (DSS) AK-510 into the space under the Shelter’s roof) using the Upgraded dust-suppression system.

    These works included making the dust-suppression formula and rinsing solution, analyzing the content of Gadolinium in the rinsing solution, testing (determining the viscosity) of dust-suppression solution, feed in of the solution into the working area of the system, washing of pipelines and injectors with the rinsing solution followed by draining of the residues of the composition and rinsing solution into the drain tank. All works have been performed by staff according to the “Operating Instructions for the Upgraded Dust Suppressions System”.

    Read more ...

    04 May 2022

    Occupation consequences: several licenses suspended

    • Print
    • Email

    On 26th of April 2022, the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) made a decision to suspend some licenses that actually stops implementation of activities on Units 1, 2 and 3 decommissioning, activities at radioactive waste management facilities and some types of activity in the use of nuclear energy.

    In particular, this refers to the suspension of the following licenses:
    — No. ЕО 000040 — for the right to implement activities at a lifecycle stage “decommissioning” of Chornobyl NPP Units 1, 2, 3.
    — No. ОВ 001092 — for the right to implement activities “processing, storage of radioactive waste” (operation of the Liquid Radioactive Waste Treatment Plant (LRTP)).
    — No. ОВ 001094 — for the right to implement activities “processing, storage of radioactive waste” (operation of NSC-SO complex).
    — No. ОВ 001095 — for the right to implement activities “processing, storage of radioactive waste” (operation of the Temporary Storage Facility for Solid Waste of III Group (High-Level Waste), Low- and Intermediate-Level Long-Lived Waste (TSF for HLW and LIL-LLW)).
    — No. ОВ 001096 — for the right to implement activities “processing, storage of radioactive waste” (commissioning of the Solid Radioactive Waste Retrieval Facility (SWRF) and Solid Radioactive Waste Processing Plant (SWPP) of the Industrial Complex for Solid Radioactive Waste Management (ICSRM).
    — No. ОВ 010950 — for the right to implement activities on the use of ionizing radiation sources.

    Read more ...

    03 May 2022

    Individual dosimetry control restored at ChNPP

    • Print
    • Email

    Work on individual dosimetry control of Chornobyl NPP's staff has been restored in full at the ChNPP. About this informed Head of Radiation Safety Shop Leonid Yakovenko.

    As is known, on 24th of February 2022 ChNPP was seized and blocked by russian forces. As a result, the Radiation Safety Shop, as well as other plant's departments, could not fulfill the designated functions and duties in full.

    “During the occupation, it was impossible to control individual radiation doses based on readings of the main individual dosimetry control equipment — “Harshaw” dosimeters. The reason is that to do this work it is necessary to involve separately trained staff from the Laboratory of individual dosimetry control.

    Read more ...

    26 April 2022

    Visit of IAEA Director General to ChNPP

    • Print
    • Email

    On April 26, Head of IAEA Rafael Mariano Grossi visited Chornobyl NPP. He led the Agency's mission on preventing nuclear accidents during the war in Ukraine. Mr Grossi was accompanied by high officials of IAEA represented Italy, France, Austria, Sweden and several other countries.

    As was declared ahead of the visit, presence of IAEA in Chornobyl would be of primary importance for activity of this organization to support Ukraine, as the Agency strives to restore the regulatory control of the NPP and to ensure its safe and reliable operation.

    The IAEA experts have delivered the equipment and set the purpose to conduct radiological surveys at the ChNPP site which was occupied by russian troops for five weeks.

    Read more ...

    14 April 2022

    ChNPP website is active again

    • Print
    • Email

    Chornobyl NPP’s official website was not active when the Plant was occupied by troops of russian federation. ChNPP had only one information broadcaster – its official Facebook page: www.facebook.com/ChornobylNPP.

    From today – 14 April 2022 – the website resumes its operation.

    Follow the updates to be well informed about the latest news of ChNPP!

    1. ChNPP switches to Downtime
    2. COVID-19 at ChNPP (updated)
    3. Happy New Year!
    4. Large-scale emergency drills were held at the Plant’s site

    Page 23 of 117

    • Start
    • «
    • 18
    • 19
    • 20
    • 21
    • 22
    • 23
    • 24
    • 25
    • 26
    • 27
    • »
    • End
    Copyright © 2025 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності