• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    1. Infocenter
    2. News
    23 November 2018

    The cooperation of Chornobyl NPP with Belgian Tecnubel company representatives will continue

    • Print
    • Email

    The third planned training course for Chornobyl NPP’s personnel delivered by specialists of Belgian company Tecnubel in the field of "BROKK-330 maintenance: base level" was started.

    BROKK-330 Manipulators are used in ICSRM for works performance. The caterpillar-mounted manipulator of this model is located in a temporary storage for High-Level, Intermedium and Low-Level Long-Lived Radioactive Waste (RAW). It is intended to place RAW packages in storage compartments. Operator controls BROKK manipulators remotely using control panels and video surveillance systems.

    This is the first training course devoted to this manipulators model. Three earlier delivered training courses at Chornobyl NPP within 2017-2018 were aimed on improvement of the skills in handling, maintenance and repair of BROKK-180 manipulators, used for the Solid Radioactive Waste retrieval.

    Read more ...

    21 November 2018

    Drill at ChNPP: simulated earthquake and its aftermath

    • Print
    • Email

    On November 21, a regular emergency response drill took place at the Chornobyl NPP. Its goal was to check the preparedness and to practice emergency actions of personnel.

    Such drills are scheduled and conducted four times a year. In particular, this drill is considered as stress-test that summarizes skills of personnel received over a year. Stress-tests were developed following the analysis of the accident running at Fukushima NPP. Their distinctive feature is simultaneous failure of several systems of a plant at different facilities.

    “According to the legend, as a result of a high power earthquake – higher than a magnitude 6 maximum design earthquake – we suffered a destruction of structures and a storage pool for nuclear fuel at ISF-1. The earthquake also affected the safety of the Shelter Object, in which fuel-containing masses changed their position. To what extent this part is real, no one can say, but we hypothetically assumed it during the drill. Moreover, there was a complete loss of power supply that resulted in the plant blackout and mass failure of equipment” — Borys Spektor, Leading Instructor of the ChNPP Training Center, commented the drill legend.

    Read more ...

    12 November 2018

    Dismantling of fuel channels and control and protection system channels was realized at Chornobyl NPP

    • Print
    • Email

    One fuel channel (FC) and one channel of control and protection system (CPS) were removed from the Unit 1 reactor. These works are carried out with a research purpose in the framework of working documentation development for the the second stage of the Project "Chornobyl Units 1, 2, 3 Final Shutdown and Preservation" (FS&P). Dismantling and processing of the channels has practical value for determination of duration for decommissioning activities, preservation and safe enclosure of reactors.

    Estimated term for FC & CPS channels dismantling and processing, according to the "Program of Units 1, 2, 3 Shutdown & Preservation Stage implementation" approved by SNRIU, until 2028. The Stage duration is determined, in particular, by the time of works execution in each of 3 reactors, containing from 1661 to 1693 FC and 227 CPS channels.

    Read more ...

    30 October 2018

    Mass Spectrometry: New Experience from Lithuania

    • Print
    • Email

    On October 26 a single week training course on the advanced radionuclide activity measurement techniques was completed at Chornobyl NPP. Experts from the LOKMIS company (Lithuania) shared their expertise with ChNPP staff.

    Continual improvement of radiochemical analysis approaches and methods as well as operations during sample preparation and measurements using complex equipment has become the prerequisite for conducting the training course, since the up-to-date methods of radiochemical analysis and radionuclide activity measurements require continual practical and theoretical sustainment and enhancement for personnel.

    The main task of the course was to provide the personnel of ChNPP laboratory with qualified training on methods of measuring alpha, beta and gamma activity of radionuclides. Special attention was focused on Agilent 7500 ICP MS mass spectrometer, which is used by the ChNPP water and radiochemistry measuring laboratory.

    Read more ...

    26 October 2018

    Chornobyl NPP and The State Exlusion Zone Management Agency represent Kyiv Region at the First Forum of the Regions of Ukraine and Belarus

    • Print
    • Email

    On October 25-26 the First Forum of the Regions of Ukraine and Belarus is held in Gomel, the main purpose of which is to present the economic potential of Ukraine and the Republic of Belarus. In this major event, which took an area of about 9,000 square meters, more than 150 enterprises present their professional experience, 57 of them represent 15 Ukrainian regions, and other 96 represent industries of Belarus. The Ukrainian delegation consists of 385 people, of which 180 are officials and more than 200 are businessmen and entrepreneurs.

    Kyiv region is represented at the Forum by the State Agency of Ukraine for Exclusion Zone Management, Chornobyl NPP and the Agency for Regional Development and some other organizations with their booths.

    Read more ...

    1. Civil Protection Drill was held for Chornobyl NPP personnel
    2. New mock-up of Chornobyl NPP
    3. Solar Power Plant was officially opened at Chornobyl NPP
    4. Chornobyl NPP was visited by the U.S. Nuclear Regulatory Commission

    Page 56 of 116

    • Start
    • «
    • 51
    • 52
    • 53
    • 54
    • 55
    • 56
    • 57
    • 58
    • 59
    • 60
    • »
    • End
    Copyright © 2025 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності